TÀI LIỆU - Mô tả quy trình xử lý nước (Nhà máy nhiệt điện khí Cà Mau)


1  INTRODUCTION

Water Treatment shall cater to the needs of both Camau 1 & Camau II for Boiler feed and potable water needs. Water from Municipal water supply (Filtered water) is treated in the Pretreatment system before it is divided into two streams, one for Boiler feed treatment and the other for Potable water treatment. The plant essentially consists of the following three systems:

1.  Pretreatment System
2.  Demineralisation System
3.  Potable water System


CONTENTS:

1  Introduction
2  Design Basis
2.1 Raw water Quality
2.2 Flow Rate Calculations
2.3 Pretreatment System
2.4 Demineralisation System
2.5 Potable Water System
3  Process Description & System configuration
3.1 Pretreatment System
3.1.1  Clarifier System
3.1.2  Filtration System
3.2  Demineralization System
 3.2.1  Reverse Osmosis System   3.2.2  Degassification System   3.2.3  Mixed Bed Ion Exchange System   3.2.4  Demineralised Water Storage & transfer system
3.3 Potable Water System
3.3.1  Nano Filtration System
3.3.2  Potable Water Storage & transfer system
4  Detailed operation concept
4.1 Pretreatment System
 4.1.1  Clarifier System    4.1.1.1  Startup procedure
  4.1.1.2  Normal operation procedure
  4.1.1.3  Shutdown procedure
  4.1.1.4  Chemical preparation procedure
 4.1.2  Conventional-Filtration System    4.1.2.1  Startup procedure
  4.1.2.2  Normal operation procedure
  4.1.2.3  Shutdown procedure
 4.1.3  Membrane Based Filtration System    4.1.3.1  Startup procedure
  4.1.3.2  Normal operation procedure
  4.1.3.3  Shutdown procedure
  4.1.3.4  Chemical Preparation Procedure
4.2 Demineralisation System
 4.2.1  Reverse Osmosis System    4.2.1.1  Startup procedure
  4.2.1.2  Normal operation procedure
  4.2.1.3  Shutdown procedure
  4.2.1.4  Chemical Cleaning Procedure
  4.2.1.5  Chemical Preparation Procedure
 4.2.2  Degassification System    4.2.2.1  Startup procedure
  4.2.2.2  Normal operation procedure
  4.2.2.3  Shutdown procedure
 4.2.3  Mixed Bed Ion Exchange System    4.2.3.1  Startup procedure
  4.2.3.2  Normal operation procedure
  4.2.3.3  Shutdown procedure
 4.2.4  Demineralised Water Storage & transfer system
  4.2.4.1  Startup procedure
  4.2.4.2  Normal operation procedure
  4.2.4.3  Shutdown procedure
4.3 Potable Water System
 4.3.1  Nano Filtration System    4.3.1.1  Startup procedure
  4.3.1.2  Normal operation procedure
  4.3.1.3  Shutdown procedure
  4.3.1.4  Chemical cleaning Procedure
4.3.2 Potable Water Storage & transfer system
  4.3.2.1  Startup procedure
  4.3.2.2  Normal operation procedure
  4.3.2.3  Shutdown procedure 
ANNEXURE A  FLOW RATE CALCULATIONS

LINK DOWNLOAD


1  INTRODUCTION

Water Treatment shall cater to the needs of both Camau 1 & Camau II for Boiler feed and potable water needs. Water from Municipal water supply (Filtered water) is treated in the Pretreatment system before it is divided into two streams, one for Boiler feed treatment and the other for Potable water treatment. The plant essentially consists of the following three systems:

1.  Pretreatment System
2.  Demineralisation System
3.  Potable water System


CONTENTS:

1  Introduction
2  Design Basis
2.1 Raw water Quality
2.2 Flow Rate Calculations
2.3 Pretreatment System
2.4 Demineralisation System
2.5 Potable Water System
3  Process Description & System configuration
3.1 Pretreatment System
3.1.1  Clarifier System
3.1.2  Filtration System
3.2  Demineralization System
 3.2.1  Reverse Osmosis System   3.2.2  Degassification System   3.2.3  Mixed Bed Ion Exchange System   3.2.4  Demineralised Water Storage & transfer system
3.3 Potable Water System
3.3.1  Nano Filtration System
3.3.2  Potable Water Storage & transfer system
4  Detailed operation concept
4.1 Pretreatment System
 4.1.1  Clarifier System    4.1.1.1  Startup procedure
  4.1.1.2  Normal operation procedure
  4.1.1.3  Shutdown procedure
  4.1.1.4  Chemical preparation procedure
 4.1.2  Conventional-Filtration System    4.1.2.1  Startup procedure
  4.1.2.2  Normal operation procedure
  4.1.2.3  Shutdown procedure
 4.1.3  Membrane Based Filtration System    4.1.3.1  Startup procedure
  4.1.3.2  Normal operation procedure
  4.1.3.3  Shutdown procedure
  4.1.3.4  Chemical Preparation Procedure
4.2 Demineralisation System
 4.2.1  Reverse Osmosis System    4.2.1.1  Startup procedure
  4.2.1.2  Normal operation procedure
  4.2.1.3  Shutdown procedure
  4.2.1.4  Chemical Cleaning Procedure
  4.2.1.5  Chemical Preparation Procedure
 4.2.2  Degassification System    4.2.2.1  Startup procedure
  4.2.2.2  Normal operation procedure
  4.2.2.3  Shutdown procedure
 4.2.3  Mixed Bed Ion Exchange System    4.2.3.1  Startup procedure
  4.2.3.2  Normal operation procedure
  4.2.3.3  Shutdown procedure
 4.2.4  Demineralised Water Storage & transfer system
  4.2.4.1  Startup procedure
  4.2.4.2  Normal operation procedure
  4.2.4.3  Shutdown procedure
4.3 Potable Water System
 4.3.1  Nano Filtration System    4.3.1.1  Startup procedure
  4.3.1.2  Normal operation procedure
  4.3.1.3  Shutdown procedure
  4.3.1.4  Chemical cleaning Procedure
4.3.2 Potable Water Storage & transfer system
  4.3.2.1  Startup procedure
  4.3.2.2  Normal operation procedure
  4.3.2.3  Shutdown procedure 
ANNEXURE A  FLOW RATE CALCULATIONS